Product Categories

Contact Us

Add:702, Block B, Zhongde Plaza, Rencheng District, Jining City, Shandong Province, China

Tel:+86-537-2331758

Fax:+86-537-2343566

Mobile:+8618369797856

E-mail:Sales01@aoxuecn.com

Knowledge

Home > Knowledge > Content
Concrete construction process for vinyl flooring
Aug 17, 2018

First, technical preparation: Seriously familiar with, review the floor construction drawings. Clarify the construction content and analyze the engineering characteristics. For the requirements of the engineering ground, the technical staff will be given the technical basis. Second, the tool preparation: the main tools, electric air welding torch, v-shaped mouth knife, zigzag scraper, roller, knife, oil brush, cutting knife, scissors, wooden hammer, rubber hammer, plastic bucket and so on. Third, the labor force preparation: Because the pvc floor installation project is more professional, so the fixed professional team construction and installation. Team members must have years of experience in flooring construction to ensure 100% construction quality. 4. Material preparation: The ground material of the project is pvc coil: the board surface is required to be smooth and smooth, without cracks, uniform color, uniform thickness, and meet the design requirements and relevant technical standards. The surface of the electrode should be smooth and smooth, without holes, no knots, wrinkles, uniform color, and the composition and performance of the electrode are the same as those of the floor. Adhesives are required to be quick-drying, high in bonding strength, strong in water resistance, environmentally friendly and non-toxic water-based adhesives and comply with relevant technical standards. Material transportation, inventory should be erected, not laid flat, stacked and stacked, to avoid deformation of pvc coil, not stored in wet, sun-lit places, to avoid discoloration of the board surface, uneven color. Adhesives should be stored separately, fireproof, and exposed to sunlight.